The challenge was the very tight deadline and the complexity/scale of the project — the need to prepare the project for execution in a very short time and to optimize the production flow to complete the houses within just as short a timeframe.
Timberframe structure made of softwood, dried in-house in the De-Narde drying chamber, and four-side planed on the Weinig machine.
The concrete result, shown exactly below.
"The structure for 10 P+2 housing units, produced in the factory in 3 months. Assembly was carried out by the beneficiary."